ALDOT News Hub
Download CSV
Region/County West Central/Tuscaloosa
Type of Work Traffic Signs
Route I-20/59
Projected Start December 2024
Projected Completion Summer 2025
Traffic Impact Intermittent shoulder closures
Project Status Active

ALDOT to improve traffic signs on I-20/59 from the Sumter County line to the Jefferson County line and on I-359 to the intersection of 12th Street in Tuscaloosa.

Read More "ALDOT to improve traffic signs on interstates in Tuscaloosa"
Region/County North/Etowah
Type of Work Resurfacing
Route I-59
Projected Start February 2025
Projected Completion Spring 2026
Traffic Impact Lane closures from 6 p.m. to 6 a.m. Sunday through Thursday nights
Project Status Active

This $7.9 million project will resurface 8.5 miles of I-59 in Etowah County, from the St. Clair County line, through Gadsden, to one mile north of the US-431/US-278 interchange in Attalla.

Read More "I-59 resurfacing in Gadsden"
Region/County West Central/Tuscaloosa
Type of Work Bridge deck repair; guardrail installation
Route I-20/59
Projected Start January 6, 2025
Projected Completion Summer 2025
Traffic Impact The contractor must keep at least one lane open at all times. Also, the contractor is not allowed to have more than a two-mile lane closure.
Project Status Active

The Alabama Department of Transportation (ALDOT) plans to repair 15 bridge decks and install new guardrail at various locations on I-20/59 westbound from near milepost 64 to near Exit 71 in Tuscaloosa.

Lane closures are expected to begin Monday, Jan. 6 and will continue until summer 2025, weather permitting. The contractor must keep at least...

Read More "ALDOT to repair bridge decks, install guardrail on interstate"
Region/County North/Dekalb, Etowah
Type of Work Reconstruction/Asphalt pavement
Route I-59
Projected Start Spring 2025
Projected Completion Spring 2027
Traffic Impact Single-lane closures northbound and southbound during crossover construction, followed by shift of all traffic to northbound roadway, separated by concrete barrier.
Project Status Active

This project will reconstruct (pavement removal, grading, drainage, base, and pavement replacement) nearly 11 miles of the I-59 southbound roadway from south of the SR-68 interchange (Exit 205) at Collinsville in DeKalb County to south of the Stephens Gap Road overpass, north of Reece City, in Etowah County.

Read More "I-59 Southbound Reconstruction from Collinsville to Reece City"
Region/County East Central/Jefferson
Type of Work Constructing the concrete repair and resurfacing on SR-38 (US-280) from the junction of Rosedale Drive in Homewood to the Cahaba River Bridge to include the construction of additional lanes (grading, drainage, pavement, traffic signals, and traffic stripe) on SR-38 (US-280) from the SR-149 (Shades Creek Parkway) interchange to the junction of Grandview Parkway. Length 5.752 miles.
Route SR-38 (US-280)
Projected Completion April 2027
Project Status Active
Region/County East Central/Jefferson
Type of Work Constructing the repair and replacement of the entrance and exit ramps (grading, drainage, pavement, bridge, and traffic signals) on I-20/59 at McAshan Drive (Exit 104) to include the intersection improvements (Diverging Diamond Intersection) at the northbound and southbound ramps southwest of McCalla. Length 0.503 miles.
Route I-20/59
Projected Start Spring 2025
Projected Completion Fall 2025
Project Status Active
Region/County East Central/Jefferson
Type of Work Constructing the concrete pavement rehabilitation on I-20/59 from a point north of the Vanderbilt Road overpass (MP 127.333) to a point north of the Aviation Avenue overpass (MP 130.596) to include the I-20 interchange in Birmingham. Length 3.262 miles.
Route I-20/59
Projected Completion Summer 2025
Project Status Active
Region/County East Central/Jefferson
Type of Work Reconstruction and lane addition (grading, drainage, pavement, bridge coating, bridge deck replacement, traffic lighting, and traffic signs) on I-59 from the junction of the I-459 interchange to the CR-10 (Chalkville Moountain Road) overpass in Trussville and on I-459 from 0.340 mile south of the SR-7 (US-11) interchange to the I-59 interchange. Length 3.822 miles.
Route I-59
Projected Completion December 2026
Project Status Active
Region/County East Central/Calhoun
Type of Work Constructing the resurfacing (scrub seal), safety improvements, and access management on SR-21 from a point 0.291 miles north of the junction of Summerall Gate Road to the junction of George Douthit Drive south of Jacksonville. Length 6.936 miles.
Route SR-21
Projected Start Spring 2025
Projected Completion Fall 2025
Project Status Active
Region/County East Central/Shelby
Type of Work Roadway improvements, widening and bridge replacement
Route I-65
Projected Start March 2025
Projected Completion Spring 2027
Project Status Active

Roadway improvements and additional lanes (grading, drainage, pavement, bridge removal, and bridge replacement) on I-65 from the US-31 interchange north of Calera to the CR-87 interchange southeast of Alabaster.

Read More "I-65 widening project in Shelby County"
Region/County East Central/Chambers
Type of Work Roadway and safety improvements
Route US-431 (SR-1)
Projected Start March 17, 2025
Projected Completion December 2025
Project Status Active

Roadway and safety improvements (truck passing lane additions, grading, drainage, pavement, micro-milling, resurfacing (scrub seal), guardrail installation, and traffic stripe) on US-431 from 0.548 miles south of the junction of CR-93 north of LaFayette to MP 175.9 north of Five Points.

Read More "Roadway and safety improvements on US-431 in Chambers County"
Region/County West Central/Marion
Type of Work Resurfacing
Route SR-187
Projected Start TBD
Projected Completion March 2025
Traffic Impact Lane closures
Project Status Active

ALDOT to make roadway improvements by widening, resurfacing and striping a portion of SR-187 from the junction of SR-17(US-43) northeast of Hamilton to the junction of CR-29.

Read More "SR-187 resurfacing in Marion County"
Region/County West Central/Walker
Type of Work Resurfacing
Route I-22
Projected Start March 26, 2025
Projected Completion Fall 2025
Traffic Impact Lane closures
Project Status Active

The Alabama Department of Transportation (ALDOT) plans to resurface a portion of I-22 in Walker County from near Exit 51 to near Exit 57.

Read More "I-22 resurfacing in Walker County"
Region/County West Central/Pickens
Type of Work Resurfacing
Route US-82
Projected Start March 2025
Projected Completion June 2025
Traffic Impact Lane closures
Project Status Active

US-82 will be restriped from the existing four lanes to three lanes. This new three-lane configuration will consist of one through-lane for northbound and southbound traffic and a continuous left-turn lane. This change will help improve traffic operations and efficiency along the route. Additionally, the project will resurface US-82 from one mile east of the...

Read More "US-82 resurfacing and road diet in Pickens County"
Region/County West Central/Greene
Type of Work Resurfacing, guardrail
Route I-20/59
Projected Start April 23, 2025
Projected Completion December 2025
Traffic Impact Lane closures
Project Status Active

The Alabama Department of Transportation (ALDOT) plans to resurface and place guardrail on a portion of I-20/59 in Greene County from near milepost 33 to near Exit 41 in Eutaw.

The project began with milling operations last week and will continue until late 2025, weather permitting. At least one lane will remain open in each...

Read More "I-20/59 resurfacing in Greene County"
Region/County Southeast/Autauga
Type of Work Capacity
Route US-82
Projected Start July 2023
Projected Completion Spring 2025
Project Status Active

Resurface the original two lanes on U.S. Highway 82 from Alabama Highway 14 to U.S. Highway 31 and replace the original bridges over Autauga Creek and the Autauga Northern Railroad. 

Read More "US-82 expansion project, Phase II"
Region/County West Central/Bibb, Tuscaloosa
Type of Work Widening, additional lanes, resurfacing, traffic striping, multi-use path installation, grade, drain, ITS installation
Route US-11
Projected Start Early 2022
Projected Completion Early 2026
Project Status Active

The purpose of this project is to resurface and add lanes to the roadway to accommodate the ongoing industrial development in the area. The project will also improve traffic flow and enhance safety.

The project will take place on US-11 between from Daimler Benz Boulevard and the Highway 5 intersection (approximately seven miles). Significant growth...

Read More "US-11 widening project from Daimler Benz Blvd. to Highway 5"
Region/County West Central/Tuscaloosa
Type of Work Additional lanes, access management, grade, drain, ITS, resurfacing, retaining walls, traffic striping
Route US-82
Projected Start December 2021
Projected Completion Fall 2024
Project Status Active

ALDOT will feature its first major Rebuild Alabama Act project in Tuscaloosa County with a job that is expected to improve traffic flow and reduce congestion along US-82 (McFarland Boulevard) from Highway 69 to Rice Mine Road.

The 2.77-mile project will add a travel lane in each direction, provide better access management to businesses and...

Read More "US-82 add lanes project in Tuscaloosa County"
Region/County Southeast/Houston
Type of Work Capacity
Route SR-210, US-231
Projected Start July 2022
Projected Completion Winter 2025
Project Status Active

Adding lanes to Ross Clark Circle from Meadowbrooke Drive to North Cherokee Avenue and on US-231 from Girard Avenue to Buyers Drive. Building service roads on Ross Clark Circle from Meadowbrooke Drive to Montgomery Highway (US-231).

Read More "Ross Clark Circle expansion Phase III"
Region/County North/Limestone, Madison
Type of Work Transportation Systems Management and Operations
Route I-565
Projected Start July 2023
Projected Completion Fall 2024
Traffic Impact Lane closures or traffic stoppages possible at times for installation of poles or structures for cameras and message boards
Project Status Active

This intelligent transportation system project on I-565 from Mooresville Road in Limestone County to U.S. 72 in Huntsville will add 10 traffic cameras, three dynamic message systems, and two weather stations for monitoring conditions and aiding traffic flow on the corridor.

Read More "I-565 Advanced Corridor Management"
Region/County Southeast/Geneva
Type of Work Capacity building and route relocation
Route SR-52
Projected Start Spring 2024
Projected Completion Spring 2027
Project Status Active

Adding a travel lane in each direction and relocate the route on SR-52 from near Cox Street in Slocomb to the intersection of Scott Road in Malvern to improve traffic flow and reduce congestion.

Read More "Additional lanes and route relocation on SR-52 in Geneva County"
Region/County Southwest/Baldwin
Type of Work Widening roadway to provide a center turn lane
Route SR-3 (US 31) from the Junction of Old Highway 31 to .265 mile East of the Junction of Coleman Lane.
Projected Start June 2024.
Projected Completion Open to Traffic
Traffic Impact Daytime Work, Scheduled detours
Project Status Active
Region/County West Central/Sumter
Type of Work Resurfacing
Route I-20/59
Projected Start Mid-March 2024
Projected Completion Fall 2024
Traffic Impact Lane closure, reduced speeds
Project Status Active

The Alabama Department of Transportation plans to resurface a portion of Interstate 20/59 from near Exit 1 to near the McCainville Road overpass at milepost 19.6 southwest of Epes to improve mobility and safety.

Read More "I-20/59 resurfacing project in Sumter County"
Region/County Southeast/Montgomery
Type of Work Intersection Modification
Route US-331
Projected Start March 2024
Projected Completion Summer 2024
Traffic Impact Lane closures
Project Status Active

Modification elimiates left turn and through traffic movements from Hobbie Road and Butler Mill Road onto US-331. RCUT intersections elimiate conflict points to increase safety and traffic efficiency with reduced serious injury and fatal crashes.

Read More "RCUT install at US-331 and Hobbie Road/Butler Mill Road"
Region/County Southwest/Conecuh
Type of Work Construction in Conecuh County to realign and modify the intersection of State Route -3 (US 31) and State Route -12 (US 84) near Evergreen.
Route State Route -3 (US 31) and State Route -12 (US 84) near Evergreen.
Projected Start June 2024
Projected Completion Late Fall 2024
Traffic Impact Intersection improvements are designed to reduce accidents in the area compared to its current configuration.
Project Status Active
Region/County West Central/Tuscaloosa
Type of Work Resurfacing; guardrail installation; traffic striping
Route SR-216
Projected Start July 15, 2024
Projected Completion December 31, 2024
Traffic Impact Flaggers and/or pilot car; possible delays
Project Status Active

The Alabama Department of Transportation plans to resurface, install guardrail and place new traffic striping on a portion of SR-216 in Tuscaloosa County from the junction of SR-215 to the junction of Lock 17 Road in Brookwood to improve mobility and safety.

Read More "SR-216 resurfacing project in Tuscaloosa County"
Region/County Southwest/Baldwin
Type of Work New two-lane roadway construction on new alignment with a roundabout at Foley Beach Express
Route 1.420 miles from a point north of the junction of CR-4 (Cotton Creek Drive) to the junction of the Foley Beach Express.
Projected Start September 2024
Projected Completion Summer 2026
Traffic Impact New Construction - some lane closures possible on Foley Beach Express for construction tie-in
Project Status Active
Region/County
Type of Work Bridge Replacement
Route US 90 Causeway in Mobile County
Projected Start Winter 2025
Projected Completion Timeline: Weather permitting construction is expected to take 500 days to complete once it starts.
Traffic Impact There will be some disruptions to traffic on the Causeway during the construction due to lane closures outside of peak travel times.
Project Status Active

ALDOT will replace the westbound span of the bridge over the Tensaw-Spanish River, near Battleship Park.

Read More "Tensaw River Bridge replacement project on the Causeway to begin early 2025."
Region/County West Central/Chilton
Type of Work Bridge Repair
Route SR-22
Projected Start November 11, 2024
Projected Completion Late 2025
Traffic Impact Single-lane closure
Project Status Active

The Alabama Department of Transportation (ALDOT) plans to perform bridge maintenance on the SR-22 bridge over the Coosa River, connecting Chilton and Coosa counties.

The work, which also includes repainting the bridge its current gray color, is intended to extend the lifespan of the bridge. The project is expected to begin Monday, November 11 and...

Read More "ALDOT to perform bridge maintenance over Coosa River"
Region/County Southeast/Lowndes
Type of Work Resurfacing
Route US-80
Projected Start May 2024
Projected Completion Early 2025
Project Status Active

Resurfacing on US-80 from SR-97 in Lowndesboro to the Pintlala Creek bridge

Read More "US-80 resurfacing"
Region/County Southeast/Montgomery
Type of Work Roundabout Installation
Route US-80
Projected Start October 2024
Projected Completion Spring 2026
Traffic Impact Lane closures and reduced speed limit.
Project Status Active

Installation of two roundabouts in Pike Road. One at SR-126 and US-80 and the other at US-80 and Marler Road.

Read More "Pike Road Roundabouts"
Region/County West Central/Tuscaloosa
Type of Work Bridge removal
Route US-11
Projected Start March 3, 2025
Projected Completion Late 2025
Project Status Active

The Alabama Department of Transportation (ALDOT) plans to remove the abandoned L and N railroad bridge on US-11 near Chamblee Avenue northeast of Woodstock in Tuscaloosa County.

The project is expected to last until late 2025.

Read More "ALDOT to remove abandoned bridge on US-11 near Woodstock"
Region/County West Central/Pickens
Type of Work New Construction
Route US-82
Projected Start October 15, 2024
Projected Completion Approximately two years
Project Status Active

The Alabama Department of Transportation (ALDOT) plans to begin the final phase of the Gordo Bypass next week that is expected to improve safety, mobility and commerce in West Alabama.

The project will realign US-82 from the northwest city limits of Gordo to just east of the Tuscaloosa County line. Once completed, US-82 will become...

Read More "Gordo Bypass final phase"
Region/County North/Limestone, Madison
Type of Work Additional lanes/bridge widening
Route I-565
Projected Start September 2024
Projected Completion Fall 2026
Traffic Impact Median and shoulder restricted by concrete barriers. Travel lanes may be narrower. Nighttime lane closures possible.
Project Status Active

This project will construct additional lanes, including grading, drainage, and widening of two bridges, on about five miles of I-565 from west of the County Line Road interchange to east of Wall Triana Highway in Madison. The project includes resurfacing and traffic stripe.

Read More "I-565 Widening from County Line Road to Wall Triana Highway in Madison"
Region/County North/Dekalb
Type of Work Reconstruction/Asphalt pavement
Route I-59
Projected Start May 2024
Projected Completion Fall 2026
Traffic Impact Single-lane closures northbound and southbound and shift of all traffic to southbound roadway, separated by concrete barrier.
Project Status Active

This project will reconstruct (pavement removal, grading, drainage, pavement and traffic stripe) more than eight miles of the I-59 northbound roadway from north of SR-40/SR-117 in Hammondville to the Georgia state line.

Read More "I-59 Northbound Reconstruction from Hammondville to Georgia line"
Region/County Southwest/Conecuh
Type of Work Constructing two additional lanes to convert the existing two lane road into a four-lane divided highway
Route US 84 from a point near MP 96.3 to I-65 interchange in Evergreen, Alabama.
Projected Start October 1, 2024
Projected Completion Summer 2026
Traffic Impact Periodic lane closures and potential delays
Project Status Active

The Alabama Department of Transportation (ALDOT) begins a significant roadway improvement project on US 84 in Conecuh County. Starting October 1, 2024, construction will begin on the widening of US 84 in Evergreen. Purpose: Enhance traffic flow and improve safety along this critical corridor linking Evergreen and I-65

Read More "Additional lane improvements US 84 Evergreen, Alabama"
Region/County West Central/Tuscaloosa
Type of Work Bridge Replacement
Route US-11
Projected Start January 15, 2024
Projected Completion Fall 2024
Project Status Active

The Alabama Department of Transportation plans to replace and widen the US-11 (Skyland Boulevard East) bridge over Norfolk Southern Railroad near Clearview Hills Drive in Cottondale.

The new bridge will have one lane in each direction and a center-left turn lane. A sidewalk will also be installed on the east side of the bridge.

...Read More "US-11 bridge replacement in Cottondale"
Region/County Southwest/Mobile
Type of Work Hwy 98/SR 158 Base and Pave from Glenwood Road to Mississippi state Line
Route SR 158 / U.S. 98
Projected Start 12/1/22
Projected Completion Open to Traffic
Traffic Impact Detour in place for US 98 traffic until 3/1/23 (estimated); US 98 traffic should follow applicable detour signs
Project Status Active

Construct the base and pave on SR-42 (US-98) (Eastbound Lanes) from the Mississippi State Line to .5 mile east of the intersection of Glennwood Road to include the Westbound Lanes west of Semmes.

Read More "Paving of US-98 / SR-158 from Glenwood Rd. to Mississippi state line"
Region/County North/Limestone, Morgan
Type of Work Bridge Rehabilitation
Route I-65
Projected Start January 2024
Projected Completion Spring 2026
Traffic Impact Single-lane closures between 6 p.m. and 6 a.m. Sunday nights through Thursday mornings during February 2024. Daytime lane closures will be necessary at times during the project, but will be limited to certain work items.
Project Status Active

This project includes structural repairs, bridge painting, and guardrail retrofit on the I-65 bridges (northbound and southbound roadways) over the Tennessee River.

Read More "I-65 Tennessee River Bridges Rehabilitation"
Region/County North/Madison
Type of Work Additional Lanes/Bridge Construction
Route US-231/US-431
Projected Start June 2023
Projected Completion Spring 2026
Traffic Impact Closure of shoulder and outside turn or acceleration lanes northbound and southbound,
Project Status Active

This project will construct additional lanes on US-231/US-431/North Memorial Parkway from south of the intersection of Mastin Lake Road to the intersection of Winchester Road in Huntsville, including a mainline overpass and access roads at Mastin Lake Road.

Read More "Memorial Parkway Overpass at Mastin Lake Road"
Region/County North/Limestone
Type of Work Additional lanes/bridge construction
Route SR-304
Projected Start August 2021
Projected Completion Spring 2025
Traffic Impact Expect lane shifts and be prepared to merge near the U.S. 31 intersection and I-65 interchange.
Project Status Active

This project is constructing additional lanes, turn lanes, intersection improvements, and interchange ramp modifications, including grading, drainage, pavement, bridge removal, bridges, bridge culvert, traffic stripe, and traffic signals on SR-304 (Old CR-24) from west of US-31 at Tanner to east of the I-65 Exit 347 interchange in Athens. The eastbound lanes have been constructed and...

Read More "Huntsville Brownsferry Road Widening"
Region/County North/Dekalb
Type of Work Concrete Pavement
Route I-59
Projected Start February 2023
Projected Completion Spring 2025
Traffic Impact Single-lane closures northbound and southbound and shift of all traffic to southbound roadway, separated by concrete barrier.
Project Status Active

This project will reconstruct (pavement removal, grading, drainage, pavement and traffic stripe) the I-59 northbound roadway from north of US-11 in Fort Payne to north of SR-40/SR-117 in Hammondville.

Read More "I-59 Northbound Reconstruction"
Region/County North/Lauderdale
Type of Work Additional Lanes
Route US-72
Projected Start October 2023
Projected Completion Fall 2026
Traffic Impact Expect reduced lane widths in work zone and intermittent lane closures.
Project Status Active

This project will expand a two-mile segment of US-72/Florence Boulevard to six lanes from Indian Springs Drive to Sky Park Road east of Florence. The project is funded through a Better Utilizing Investments to Leverage Development grant obtained by Lauderdale County as well as a combination of state and other federal funding.

Read More "Florence Boulevard Widening"
Region/County North/Dekalb
Type of Work Bridge Replacement
Route SR-75
Projected Start October 2023
Projected Completion Summer 2025
Project Status Active

This project will replace the bridge on SR-75 at Town Creek in Lakeview in DeKalb County, near the Marshall County line. The old bridge will remain open to traffic during construction. It will be demolished after completion of the new bridge.

Read More "SR-75 Town Creek Bridge Replacement"